Welcome To CHUANGRONG

China Wholesale hdpe steel transition Factory – Water And Gas Supply HDPE Electrofusion Fittings , HDPE End Cap PN16 SDR11 PE100 – CHUANGRONG

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We offer wonderful energy in high-quality and improvement,merchandising,product sales and marketing and advertising and procedure for Fittings For Poly Pipe, Pe End Cap, Hdpe Fitting, We look forward to supplying you with our products in the near future, and you will find our quotation is very reasonable and the quality of our products is very excellent!
China Wholesale hdpe steel transition Factory – Water And Gas Supply HDPE Electrofusion Fittings , HDPE End Cap PN16 SDR11 PE100 – CHUANGRONG Detail:

Detail Information

Product Name: Electrofusion HDPE Fittings End Cap For Water And Gas Supply PN16 SDR11 PE100 Specification: 32mm~110*mm PE100 PN16 SDR11
Standard: EN 12201-3:2011,EN 1555-3:2010 Application: Gas,Water,Oil Etc
Material: PE100 Virgin Raw Material Port: China Main Port

Product Description

Electrofusion HDPE Fittings End Cap for Water and Gas supply PN16 SDR11 PE100

Production Description of Electrofusion HDPE End Cap

Electrofusion HDPE fittings are welded by electrofusion machine to connect HDPE pipes together:

After electrofusion welding machine plug in electricity and turn on, The copper wire buried inserted in electric fuse HDPE fittings are heated and make HDPE melt, Which joint HDPE pipe and fittings well.

Specification

Specification

φD

L A φd
32 60 45 4.7
40 70 55 4.7
50 70 55 4.7
63 80 55 4.7
90 95 55 4.7
110 105 70 4.7

Details

Products name Electrofusion HDPE End Cap
Sizes Available As below specification sheet in detail
SDR SDR11,SDR17
PN PN16,PN10
Material Brand SINOPEC, BASELL, SABIC, BOROUGE etc
Executive Standard EN 12201-3:2011,EN 1555-3:2010
Colors Available Black color , blue color, Orange or as request.
Packing Method Normal export packing. by carton
Production Lead Time Depending on the order quantity.Normally about 2~3 weeks for 20′ GP, 3~4 Weeks for a 40′GP.
Certificate ISO, CE,BV,Factory Test Report
Supply Ability 100000 Ton/Year
Payment Method T/T, L/C at sight
Trading Method EXW, FOB, CFR, CIF,DDU

Factory Test report

Test item Standard Conditions Results Unit
1.Melt Flow Index ISO1133 190°C & 5.0Kg 0.2-0.7 0.49 g/10min
2.Density ISO1183 @23°C ≥0.95 0.960 g/cm3
3.Oxidation Induction Time ISO11357 210°C >20 39 Min
4. Hydrostatic Pressure Test ISO1167 80°C 165h, 5.4Mpa Passed
5 Size Check ISO3126 23°C Passed
6 Appearance Clean& Smooth 23°C Passed
  • The results according to test 1-3 are taken form the PE raw material supplier’s report.
  • The results according to test 4-6 are taken from the internal test results of fittings sampled from the
  • same batch as delivered fittings.
  • Marking according EN 12201 – 3 and EN 1555 – 3.
  • The pass/fail criteria are based on the requirements of the UNI EN 12201 and UNI EN 1555 standards.

Certifications

We can supply ISO9001-2008, BV ,SGS, CE etc certification.All kinds of products are regularly conducted pressure-tight blasting test,longitudinal shrinkage rate test, quick stress crack resistance test, tensile test and melt index test, so as to ensure the quality of products totally reach the relevant standards from raw materials to finished products.

20191128170625_40914


Product detail pictures:

China Wholesale hdpe steel transition Factory –  Water And Gas Supply HDPE Electrofusion Fittings , HDPE End Cap PN16 SDR11 PE100 – CHUANGRONG detail pictures

China Wholesale hdpe steel transition Factory –  Water And Gas Supply HDPE Electrofusion Fittings , HDPE End Cap PN16 SDR11 PE100 – CHUANGRONG detail pictures

China Wholesale hdpe steel transition Factory –  Water And Gas Supply HDPE Electrofusion Fittings , HDPE End Cap PN16 SDR11 PE100 – CHUANGRONG detail pictures

China Wholesale hdpe steel transition Factory –  Water And Gas Supply HDPE Electrofusion Fittings , HDPE End Cap PN16 SDR11 PE100 – CHUANGRONG detail pictures


Related Product Guide:

We can always satisfy our respected customers with our good quality, good price and good service due to we are more professional and more hard-working and do it in cost-effective way for China Wholesale hdpe steel transition Factory – Water And Gas Supply HDPE Electrofusion Fittings , HDPE End Cap PN16 SDR11 PE100 – CHUANGRONG , The product will supply to all over the world, such as: Spain, Naples, venezuela, We always insist on the management tenet of "Quality is first, Technology is basis, Honesty and Innovation".We are able to develop new products continuously to a higher level to satisfy different needs of customers.
  • Cooperate with you every time is very successful, very happy. Hope that we can have more cooperation!
    5 Stars By Phoebe from Jakarta - 2017.08.21 14:13
    This supplier stick to the principle of "Quality first, Honesty as base", it is absolutely to be trust.
    5 Stars By Beulah from Leicester - 2018.10.09 19:07

    Send your message to us:

    Write your message here and send it to us

    Send your message to us:

    Write your message here and send it to us